Even the Present Government of Nepal had promised to decrease the load shedding hour in this Year t doesn't seem to be come real. Nepal Electricity Authority (NEA) has decided to increase the load-shedding hours for the second time in the past 10 days. The new load-shedding regime will come into effect from December 8.
The state-monopoly on supply of electricity has hiked the load-shedding hours by 14 hours to make it 70 hours a week from the existing 56 hours. This means that consumers will now have to face 10 hours of daily power cuts from Saturday.
NEA has said reduction of water level and flow in the rivers with the onset of winter has severely depleted its capacity to generate more electricity and made it mandatory to increase load-shedding.
Get The schedule Below:Effective from December 08, 2012.
Load Shedding Schedule Effective from December 8 2012 |
Load-shedding will take place on the given time inside the Kathmandu Valley and 5 minutes after the given time outside the Valley.
Depending upon the condition, load-shedding could increase/decrease by one hour.
0 comments:
Post a Comment