Showing posts with label Schedule. Show all posts
Showing posts with label Schedule. Show all posts

New Load Shedding Schedule Effective from September 15 2013 (Bhadra, 30 2070)

The days have arrived  that will  force Nepalese to live in dar for more hours as Nepal electricity authority  haas announced new load shedding schedule Effective from September 15, Bhadra 30 Sunday

New loadshedding schedule is over here to make you easier in each step of your action. Being a Nepali, it has been a great importance to know loadshedding schedule.
There are different applications on mobile or on laptop that can show you loadshedding time table as soon as the time table gets changed. Like wise, We are giving you online and providing regular updates on loadshedding time tables. Commonly power cut off due to high load usages in comparison to the rate of generation of electricity is loadshedding. It usually happens in Nepal and this time, there will be less loadshedding as NEA has reduced the time table/schedule.
 Click the image below to enlarge the image  get the load shedding schedule
Load shedding schedule effective from 30 bhadra 2070

New Load Shedding Schedule Effective From Magh 21 2069(Feb 03 2013)

As promised by Prime Minister, NEA( Nepal Electricity Authority) has reduced the load-shedding hours from 14 hours to 12 hours a day. This comes in effect after India continued the previously halted 24 MW electricity to Nepal. Here is the new load-shedding schedule to be effective from Magh 21 (Feb 03, 2012) which is published on Magh 19 (Feb 1, 2012). Click to download the full picture.

New Load-shedding Schedule Effective From December 8 2012 (Mangshir 23 2069)

Even the Present Government of Nepal had promised to decrease the load shedding hour in this Year t doesn't seem to be come real. Nepal Electricity Authority (NEA) has decided to increase the load-shedding hours for the second time in the past 10 days. The new load-shedding regime will come into effect from December 8.

The state-monopoly on supply of electricity has hiked the load-shedding hours by 14 hours to make it 70 hours a week from the existing 56 hours. This means that consumers will now have to face 10 hours of daily power cuts from Saturday.

NEA has said reduction of water level and flow in the rivers with the onset of winter has severely depleted its capacity to generate more electricity and made it mandatory to increase load-shedding.

Get The schedule Below:Effective from December 08, 2012.
Load Shedding Schedule Effective from  December 8 2012

Load-shedding will take place on the given time inside the Kathmandu Valley and 5 minutes after the given time outside the Valley.


Depending upon the condition, load-shedding could increase/decrease by one hour.

Lady Gaga announces European tour dates


Lady Gaga is gearing up for another world tour as she announced the dates for the European leg of her 'Born This Way Ball' tour. The 26-year-old singer took to her Twitter account to inform fans about the first 21 dates of the tour, which will start in Bulgaria on August 21 and end in Barcelona on October 6.

"The first 21 European dates to THE BORN THIS WAY BALL will be announced and tweeted at 3am EST/12am PST/7am GMT. I'm so excited! #pawsup," the Daily Mail quoted her as tweeting.

 "ATTENTION EUROPEAN LITTLE MONSTERS: THE BORN THIS WAY BALL FIRST 21 DATES ARE HERE. #ImGoingToTheBTWBall," she wrote.

Gaga's announcement comes after both the Asian and Australasian legs sold out incredibly quickly.

The tour, produced by Live Nation, kicks off in Seoul, North Koreaon April 27.

British glam rockers The Darkness will be her support act for the European tours.

"The Haus of Gaga and I have worked for months conceiving a spectacular stage.


"The Born This Way Ball is an Electro-Metal Pop-Opera; the tale of the Beginning, the genesis of the Kingdom of Fame. How we were birthed and how we will die celebrating," the singer said in a statement. The new tour is her first gigs since the phenomenal sales of her last album 'Born This Way', which has sold almost 6 million copies since its May 2011 release.

Details of Laday Gaga Tour Date in Asia and Europe along with  Venue is given Below 

APR 27 2012
OLYMPIC STADIUMSEOUL, KOR

MAY 2 2012
ASIA WORLD ARENAHONG KONG, CHN

MAY 3 2012
ASIA WORLD ARENAHONG KONG, CHN

MAY 5 2012
ASIA WORLD ARENAHONG KONG, CHN

MAY 7 2012
ASIA WORLD ARENAHONG KONG, CHN

MAY 10 2012

MAY 10 2012

MAY 12 2012

MAY 13 2012

MAY 17 2012

MAY 18 2012

MAY 21 2012

MAY 25 2012

MAY 28 2012
INDOOR STADIUM  SINGAPORE, SGP

MAY 29 2012
INDOOR STADIUM SINGAPORE, SGP


MAY 29 2012
INDOOR STADIUM SINGAPORE, SGP

MAY 3 12012
INDOOR STADIUM SINGAPORE, SGP

JUN 3 2012

JUN 3 2012

JUN 7 2012
VECTOR ARENA AUCKLAND, NZL

JUN 8 2012
VECTOR ARENA AUCKLAND, NZL

JUN 10 2012
VECTOR ARENA AUCKLAND, NZL

JUN 13 2012

JUN 14 2012

JUN 16 2012

JUN 20 2012
ALLPHONES ARENASYDNEY, AUS

JUN 21 2012
ALLPHONES ARENASYDNEY, AUS

JUN 23 2012
ALLPHONES ARENASYDNEY, AUS

JUN 24 2012
ALLPHONES ARENASYDNEY, AUS

JUN272012
ROD LAVER ARENAMELBOURNE, AUS


JUN 28 2012
ROD LAVER ARENAMELBOURNE, AUS

JUN 30 2012
ROD LAVER ARENAMELBOURNE, AUS

JUL 1 2012
ROD LAVER ARENAMELBOURNE, AUS

JUL 3 2012
ROD LAVER ARENAMELBOURNE, AUS

JUL 7 2012
BURSWOOD DOME PERTH, AUS

JUL 8 2012
BURSWOOD DOME PERTH, AUS

AUG 14 2012

AUG 16 2012

AUG 18 2012

AUG 21 2012
VINGIS PARK VILNIUS, LTU

AUG 23 2012
RIGA MEZAPARKS RIGA, LVA

AUG 25 2012

AUG 27 2012
HARTWALL AREENAHELSINKI, FIN

AUG 30 2012
ERICCSON GLOBE STOCKHOLM, SWE

SEP 2  2012
PARKEN STADIUMCOPENHAGEN, DNK

 SEP 4 2012
LANXESS ARENA  KÖLN,, DEU

SEP 8 2012

SEP 11 2012
MEN ARENA MANCHESTER, GBR

SEP 15 2012
AVIVA STADIUM DUBLIN, IRL

SEP 17 2012
ZIGGO DOME AMSTERDAM, NLD

SEP 22 2012
STADE DE FRANCEPARIS, FRA

SEP 24 2012
TUI ARENA HANNOVER, DEU

SEP 26 2012
HALLENSTADION ZURICH ZURICH, SWITZERLAND

SEP 29 2012
SPORTPALEIS ANTWERP, BEL

 OCT 2 2012

OCT 4 2012

OCT 6 2012
PALAU SANT JORDIBARCELONA, SPAIN

New Load Shedding Schedule of Nepal ( effective From 16th january 2012)

Dear residents of nepal , the Loadshedding hours in nepal have been increased and New Schedule will eb effective from  16th january 2012. So its necessary to know the schedule to perform the housework perfectly. So here is the new Schedule of Loadshedding that will be effective from today. Depending upon the condition, load-shedding could increase/decrease by one hour.
The load-shedding will be two more hours in the areas of the feeders where 40 to 50 per cent of electricity leakage is recorded.
The load-shedding will be three more hours in the areas of the feeders where more than 50 per cent of electricity leakage is recorded.So please inform the NEA authority if you find someone stealing electricity near your place and get less load shedding 

    Share

    Twitter Delicious Facebook Digg Stumbleupon Favorites More